
Asbestos removal
Identification, removal and disposal of asbestos-containing materials before demolition begins, with clearance documentation.
Get a quoteMost buildings in Sydney put up before the 1990s contain some asbestos, in fibro sheeting, eaves, vinyl floors, lagging, roofs or switchboards. It has to come out before anything else does. We remove it under controlled conditions, dispose of it at licensed facilities and get the area cleared so the rest of the job can go ahead.
What's included
Hazardous materials review
We work from the site's hazardous materials survey, or arrange one, so every asbestos-containing material is known before the price is set.
Bonded asbestos removal
Fibro sheeting, eaves, roofing, vinyl tiles and other bonded materials removed intact wherever possible.
Friable asbestos removal
Lagging, insulation and other friable materials removed inside sealed enclosures with the controls the work requires.
Air monitoring
Air monitoring arranged during removal where the work calls for it.
Disposal
Asbestos waste wrapped, labelled and taken to licensed disposal facilities, with disposal records kept.
Clearance
An independent clearance inspection and certificate before the area is handed back for demolition or refurbishment.
Sealed off, removed, cleared. Then the machines come in.
How we run it
Every asbestos removal job follows the same order, so nothing is missed and the next trade gets a site they can start on.
- 01
Identify
Review the hazardous materials survey and confirm the type, condition and quantity of asbestos on site.
- 02
Notify and set up
Required notifications lodged, the work area isolated, signage up and enclosures built where needed.
- 03
Remove
Materials removed using wet methods and controlled techniques, then sealed and labelled for disposal.
- 04
Dispose
Waste transported to licensed facilities with records for every load.
- 05
Clear
Independent inspection and clearance certificate issued before the next trade starts.
Common questions
How do I know if my building has asbestos?
If it was built or renovated before 1990 it probably does. A hazardous materials survey confirms what is there and where, and we can arrange one.
Can asbestos removal and demolition be one contract?
Yes. We remove the asbestos, get the clearance, then carry straight on with the strip-out and demolition.
What paperwork do I get?
Disposal records for the asbestos waste and a clearance certificate for the area, which builders and certifiers will ask for.
Price your asbestos removal job.
Send the address and what needs doing. We'll come back with a scope and a price.




