The last part of our job is getting the ground right for whoever builds next. Levels, drainage and access are set up so the builder can start on a site that works from day one.
What's included
Earthworks
Cut and fill, site levelling and trimming to design levels.
Drainage
Stormwater pipes, pits and trenches installed to the civil design.
Site preparation
Site access, hardstand and laydown areas set up for the build.
Trenching
Trenches for services and drainage dug and backfilled.
Compaction
Fill placed and compacted in layers, ready for the geotechnical engineer's testing.
Make-good
Kerbs, footpaths and surfaces around the site reinstated where required.
The ground, ready for the builder.
How we run it
Every civil works job follows the same order, so nothing is missed and the next trade gets a site they can start on.
- 01
Review
Check the civil drawings, levels and geotechnical requirements.
- 02
Set out
Levels and alignments set out before work starts.
- 03
Build
Earthworks and drainage installed in the order the design and the site need.
- 04
Test
Compaction and levels checked as work progresses.
- 05
Hand over
Site handed to the builder with access and drainage working.
Common questions
Do you only do civil works after your own demolition?
No. We take on civil and site preparation packages on their own as well.
Who tests the compaction?
The project's geotechnical engineer. We place and compact the fill ready for their testing.
Can you install stormwater drainage?
Yes, to the project's civil design.
Price your civil works job.