DECAIndustries Get a quote
Excavator on a graded earthworks pad

Civil works

Site preparation and civil works that get the ground ready for the builder.

Get a quote

The last part of our job is getting the ground right for whoever builds next. Levels, drainage and access are set up so the builder can start on a site that works from day one.

What's included

Mini excavator digging a trench beside a footpath

The ground, ready for the builder.

How we run it

Every civil works job follows the same order, so nothing is missed and the next trade gets a site they can start on.

  1. 01

    Review

    Check the civil drawings, levels and geotechnical requirements.

  2. 02

    Set out

    Levels and alignments set out before work starts.

  3. 03

    Build

    Earthworks and drainage installed in the order the design and the site need.

  4. 04

    Test

    Compaction and levels checked as work progresses.

  5. 05

    Hand over

    Site handed to the builder with access and drainage working.

Common questions

Do you only do civil works after your own demolition?

No. We take on civil and site preparation packages on their own as well.

Who tests the compaction?

The project's geotechnical engineer. We place and compact the fill ready for their testing.

Can you install stormwater drainage?

Yes, to the project's civil design.

Price your civil works job.

Send the address and what needs doing. We'll come back with a scope and a price.

Area
Sydney and surrounds
Company
Deca Australia Pty Ltd
What's on the site?

Pick the closest match.

What needs doing?

Select everything that applies.

Tell us about it

Best guesses are fine. We confirm everything on site.

m²
Main construction
Any asbestos?
Site access
Approvals
When do you want to start?
Where is it, and who do we call?

We'll come back with a scope and a price.

Check and send

We only use these details to reply about your site. Nothing is shared or added to a mailing list.